#cost-overruns

1 entry with this tag

Corruption & Grift

Trump's New Air Force One Is a $400 Million Qatari Royal Jet Converted with $934 Million Diverted from Nuclear Missile Funds — It Has Fake Books, Gold Fixtures, and Will Become His Personal Property — Congress Was Never Asked, Pence Called It a "Bad Idea," and the Senate Called It an Illegal Emolument

Trump took his maiden flight on the new Air Force One — a Boeing 747-8 previously used by the Qatari royal family, gifted to the United States by the government of Qatar. The plane is worth $400 million before modifications. The cost of converting it was hidden inside the classified Sentinel nuclear missile modernization program: the New York Times reported $934 million was transferred from the missile project — which is already 81% over budget — to retrofit a luxury jet for presidential vanity. The Air Force has declined to disclose the actual modification cost, citing classification, while Secretary Meink claims it was "less than $400 million." The interior features gold light fixtures, plush carpets, lie-flat seats, wood paneling, Trump's preferred navy-and-red color scheme, and fake books — Karoline Leavitt's Instagram video accidentally revealed shelves lined with decorative volumes simply labeled "library." The plane will become Trump's personal property after his term, transferred to the Donald J. Trump Presidential Library Foundation at Air Force expense. The Constitution's Emoluments Clause prohibits accepting foreign gifts without congressional consent. Congress was never asked. A Senate resolution formally declared it an "illegal emolument." Mike Pence called it a "bad idea," noting Qatar "supports Hamas" and "financed pro-Hamas protests." Ben Shapiro called it "shady behavior." Meanwhile, the two actual new Air Force One planes Boeing was contracted to build in 2018 for $3.9 billion are now $6.2 billion and four years behind schedule — with delivery pushed to 2028 or later. Trump's original paint scheme for those planes (dark red and blue) was rejected because the dark colors would cause engine overheating. He revived the scheme anyway. The Air Force has not explained how the thermal concerns were addressed.